|

| |
|
![[36K JPEG - pic of gantry lifting]](images/g1517a.jpg) |
| Blocker's 400-ton four point
gantry at work |
|
|
|
For the past 22 years, Blocker Transfer has operated one of the largest
in-house heavy plant rigging departments in the moving industry. Using solely our own
equipment and personnel, we can plan, dismantle, pack, transport, reassemble and position
your heavy, delicate, or expensive equipment -- as a turnkey service. |
|
![[8K JPEG - 'Big Bertha' being loaded]](images/rc0003a.jpg) |
Heavy Loads on the Roads |
|
Open roads have per-wheel weight limits, so for those really big loads, we
use really big trailers. This trailer has almost 50 tires on it, to spread the weight out
and avoid cracking the pavement. This particular piece of equipment was so big and
heavy, we had to use two cranes to get it loaded. |
|